13:31 uur 03-08-2015

AEG Power Solutions Selected by Fincantieri to Provide Power Supply Solutions for Cruise Vessel

ZWANENBURG, The Netherlands–(BUSINESS WIRE)– AEG Power Solutions (FWB:3W9K), a global provider of power electronic systems and solutions for industrial power supplies and renewable energy applications, announced that Fincantieri S.p.A. has selected its power systems solutions to secure all critical loads applications on board Seabourn Encore, an ultra-luxury cruise ship that Fincantieri will build for Seabourn, a brand of Carnival Corporation.

This Smart News Release features multimedia. View the full release here: http://www.businesswire.com/news/home/20150803005600/en/

Seabourn luxury cruise ship, by courtesy of FINCANTIERI S.p.A. - All rights reserved (Photo: Busines ... Seabourn luxury cruise ship, by courtesy of FINCANTIERI S.p.A. – All rights reserved (Photo: Business Wire).

A combination of AC ( Protect 8 and Protect 4) UPS and DC ( Protect TPR) systems will be delivered to Fincantieri in December this year. They will secure the electrical power supply for automation, ship digital communications, public address safety system, emergency diesel generator and low location lighting. Power supply is a critical part of security on board.

Fincantieri has said that safety will be one of this ship’s major features. It will be built using the latest technologies, whose standards will exceed the requirements of the relevant legislation.

Given the technical challenge, Fincantieri selected AEG Power Solutions based on the high reliability of its products and their perfect match to the ship builder’s high level of requirements, and in particular their stable performance stable in harsh environments. AEG Power Solutions has a proven track record in the marine market, and its expertise positions it strongly to provide power supplies when safety is at stake.

Seabourn Encore will start sailing in the end of 2016. The all-suite ship will be approximately 40,350 gross tonnes, 210 metres long and 28 metres wide and will be able to reach a cruising speed of 18.6 knots. It will carry up to 600 guests.

Fincantieri has built 70 cruise ships since 1990, of which 47 have been since 2002. Another 14 ships are currently being designed or built in the company’s yards.

# # #

About AEG Power Solutions
AEG Power Solutions (AEG PS) Group is a global provider of power electronics systems and solutions for all industrial and demanding commercial power requirements offering one of the most comprehensive product and service portfolios in the area of uninterruptible power supply and power management.

Thanks to its distinctive expertise bridging both AC and DC power technologies and spanning the worlds of both conventional and renewable energy, the company creates innovative solutions for next generation distributed power generation.

AEG Power Solutions Group is the sole subsidiary of the holding company 3W Power S.A. (WKN A114Z9) / ISINLU1072910919), based in Luxembourg. The Group is headquartered in Zwanenburg in the Netherlands. The shares of 3W Power are admitted to trading on Frankfurt Stock Exchange (ticker symbol: 3W9K).

For more information, visit www.aegps.com.

This communication does not constitute an offer or the solicitation of an offer to buy, sell or exchange any securities of 3W Power. This communication contains forward-looking statements which include, inter alia, statements expressing our expectations, intentions, projections, estimates, and assumptions. These forward-looking statements are based on the reasonable evaluation and opinion of the management but are subject to risks and uncertainties which are beyond the control of 3W Power and, as a general rule, difficult to predict. The management and the company cannot and do not, under any circumstances, guarantee future results or performance of 3W Power and the actual results of 3W Power may materially differ from the information expressed or implied in the forward-looking statements. As a result, investors are cautioned against relying on the forward-looking statements contained herein as a basis for their investment decisions regarding 3W Power.

3W Power undertakes no obligation to update or revise any forward-looking statement contained herein.

Contacts

Claire Pairault
Corporate Communications
AEG Power Solutions
Mobile: +33 6 19 60 91 64
Email: claire.pairault@aegps.com
or
Contact for Editors
Anja-Maria Hastenrath
embedded PR
Phone +49 (0)89 / 64913634-12
Cell +49 (0)171 / 1959330
ah@embedded-pr.com

Check out our twitter: @NewsNovumpr